Standard Building Contract
The Joint Contracts Tribunal (JCT) was formed by the Royal Institute of British Architects (RIBA) In 1931 when the first JCT standard form of building contract was issued (although the forms were not referred to as ‘JCT’ until 1977). JCT became a Limited Company in 1998. It now produces a range of standard forms of contract for the construction of buildings accompanied by guidance notes and other standard forms of documentation.
The JCT Standard Building Contract is intended for large or complex construction projects, procured via the traditional procurement route, where detailed contract provisions are needed.
The 2016 edition was released on 4 November 2016. New features include:
- Incorporation of the provisions of the JCT Public Sector Supplement 2011.
- Adjustments to reflect the Construction (Design & Management) Regulations 2015 and the Public Contracts Regulations 2015.
- Amendments to the works and existing structures insurance provisions.
- Revision and simplification of the Section 4 Payment provisions.
- Provisions for the grant of Performance Bonds and Parent Company guarantees.
- Revisions to the way the requirements for Collateral Warranties are set out.
- Incorporation of the provisions of the JCT 2012 Named Specialist Update.
The 2016 edition includes the following documents:
- Standard Building Contract With Quantities (SBC/Q).
- Standard Building Contract Without Quantities (SBC/XQ).
- Standard Building Contract With Approximate Quantities (SBC/AQ).
- Standard Building Contract Guide (SBC/G).
- Standard Building Sub-Contract Agreement (SBCSub/A).
- Standard Building Sub-Contract Conditions (SBCSub/C).
- Standard Building Sub-Contract with sub-contractor’s design Agreement (SBCSub/D/A).
- Standard Building Sub-Contract with sub-contractor’s design Conditions (SBCSub/D/C).
- Standard Building Sub-Contract Guide (SBCSub/G).
- Standard Building Contract With Quantities (SBC/Q) Tracked Change Document.
- Standard Building Contract Without Quantities (SBC/XQ) Tracked Change Document.
- Standard Building Contract With Approximate Quantities (SBC/AQ) Tracked Change Document.
[edit] Related articles on Designing Buildings Wiki
- Articles of agreement.
- Collateral warranty.
- Construction contract.
- CPC2013.
- FIDIC.
- Intermediate Building Contract.
- JCT.
- JCT Design and Build Contract.
- Key dates.
- Latham report.
- Management Building Contract.
- Minor works.
- Modifying clauses in standard forms of contract.
- NEC3.
- Procurement route.
- Standard form of contract.
- Sub-contract.
Featured articles and news
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
ECA progress on Welsh Recharging Electrical Skills Charter
Working hard to make progress on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.